Lived on-board Hadar

Saturday, March 19, 2016

Jewellery Quarter and Birmingham Library

This morning Jo and I visited the Jewellery Quarter, and then the new Birmingham Library, from which we could see Hadar.

SAM_1641SAM_1641b

Then we had another Chinese buffet at the Big Wok.

Last time we came to Birmingham, by train from Warwick, I took a photo of Jo sitting on the bench in ‘The Cube’ with the statue man sitting reading a paper, but for some reason my camera didn’t record the photo, so she posed again for the same photo today.

SAM_1642

Keith.

Friday, March 18, 2016

Granville Street Wharf to Sheepcote Bridge.

We moved the short distance from Granville wharf to Sheepcote bridge, our favourite mooring opposite the Barclaycard Arena, formerly the NIA.

SAM_1629

We then walked into the City. We wandered around the Birmingham market looking for some material Jo was after to make some blinds for the galley, and she found some. Jo wanted to see the National Trust Back to Backs, which are near the Chinese quarter, which was rather handy.

SAM_1634SAM_1633

The BBC were there for filming, and waiting inside the Trust shop was Adrian Chiles and Birmingham historian Carl Chinn waiting to start filming.

We then went to our favourite Chinese buffet, the Big Wok, which was just around the corner.

SAM_1636

We then went back through the indoor markets as Jo was looking for some new netting for the galley which she also found.

We then walked around a part of Birmingham we had never been to before and found the Birmingham Cathedral.

SAM_1638

We watched the old library being knocked down.

SAM_1630

Which has now been replaced by the new library in its new location.

SAM_1639

We even found the eye shaped screen above New Street station.

SAM_1637

SAM_1637b

Keith.

Thursday, March 17, 2016

Lapworth Top Lock to Granville St, near the Mailbox in Birmingham City.

A good trip today into Birmingham, and we are now moored at Granville Street Wharf, Birmingham. The mailbox is in front of and to the right of us.

SAM_1628

We did stop at Bournville for a while and wandered around part of the Bournville village. We passed on Cadbury World as it would have cost over £27 for the 2 of us!

SAM_1616

Our temporary mooring at Bourneville with the Cadbury factory in the background.

SAM_1617

Staff sales shop at Cadbury’s.

SAM_1618

Bournville Baths

SAM_1617b

Bournville Baths again.

SAM_1627

Cricket clubhouse.

SAM_1622

Cadbury’s factory as seen across the playing fields.

SAM_1626

Quakers church, the Cadbury family were Quakers.

SAM_1625

The shops at the Green.

SAM_1624

The Bournville Rest House, now the visitor centre in the middle of the Green.

SAM_1623

The Carillon on top of the school. There are 48 bells of varying sizes out in the open underneath the weathered copper roof. The largest bell weighs 7.5tonnes.

Keith.

Tuesday, March 15, 2016

Lapworth Church

Jo and I visited Lapworth church this morning.

SAM_1611SAM_1610SAM_1608

This is the new stain glassed window which was installed last year.

Keith.

Monday, March 14, 2016

Lapworth Top Lock

No moving today, so still moored above Lapworth top lock. Unloaded some of Jack's garden furniture which we have carried for her from her mooring to her cottage.

Keith.

Sunday, March 13, 2016

Tom o’ the Wood to Lapworth Top Lock

Now moored above Lapworth top lock, Jo steered Hadar through a few locks today, she is getting quite good at it now.

SAM_1607SAM_1606SAM_1602SAM_1596SAM_1590SAM_1589

Keith.

Saturday, March 12, 2016

Hatton to Tom o’ the Wood (Bridge No.63

SAM_1588

A short run today to ‘Tom o’ the Wood’ at Bridge No.63. After lunch Jo and I had a nice pint of Doombar each at the ‘Tom o’ the Wood’, and the weather was so nice we sat in the garden to sup it. Later Bob and Kate on Glenfield arrived and have moored up in front of us, heading towards London.

Keith.

Friday, March 11, 2016

Saltisford Arm to Hatton.

Today we set off on our travels for this year. We had arranged with Tom & Lynn on Moonstone, who were winter moorers at Saltisford, to share the locks, which made life a lot easier. Their friend Denise had walked down the locks to meet us and help us with the locks. We had to stop in lock 36 to await the final clear up at lock 38 by CRT where they had been working on the lock as part of the winter stoppages.

 

SAM_1580

SAM_1581

We sat in the lock and had beer, coffee, wine, coffee & walnut cake, crisps and popcorn. We were only held up for 1hr 30mins , so not too bad. At least it was a pleasant day sitting in the sunshine with good company.

SAM_1584

Approaching the CRT yard near the top of the flight.

SAM_1585

The Café and the top lock, we had left Moonstone 2 locks down as they were going to go into the dry dock, but Lynn and her friend Denise helped us up the last 3 locks.

SAM_1586

Moored up for the night on the visitor moorings at the top of the Hatton Flight.

Keith.

Sunday, March 06, 2016

Final Preparations

This morning Jo and I have finished the tasks on the outside of the boat in preparation for our setting off on our summer cruise this coming Friday. This included removing the winter front strings and replacing them with the summer ones, fitting the trivets to the top of the pigeon box, lowering the solar panel from it’s winter position to it’s cruising position and getting the keb and mops out of the hold and into place. There are a few more jobs to be done inside, but not too many as most of them have already been done. We are now getting fidgety to set off and cannot wait to get moving.

Keith.

Friday, March 04, 2016

Plans for the New Model Railway Layout

When I built my ‘0’ gauge layout Holmehurst I made a mock model out of paper to work out where everything went, especially as the main layout was on 4 boards, which for transporting were paired together with the scenery inside the resultant box, with the ends of each pair held as a box by pieces of plywood utilising the bolt holes to join the sections together. To make each box as small as possible it was important that all the buildings, etc. interlocked between each other.

With this experience behind me, I have made 3 models of the new layout I hope to build in the hold. Each model is 1/10th scale.

SAM_1522bSAM_1521b

This is model No.1. The actual size will be 12ft long by 2ft wide. It is not the complete layout, but the main scenic part. It is part of a complete circle with a 12ft by 1ft wide section on the opposite side of the hold, both parts will be linked by 3inch wide sections at each end, with hinged parts to allow pedestrian access through this section of the hold. The 1ft wide section will be a large ‘fiddleyard’ section with multiple storage tracks where prepared trains will be stored ready to be used on the layout. I want to incorporate a canal scene in this layout so that I can include the rather nice scale model that someone made for me of ‘Hadar’. The blue painted area is the canal which is a terminus, with the canal disappearing into a tunnel. The lines are the railway tracks and the dotted lines are the continuation of the tracks underground. If you follow the lines you will see that it is a figure-of-eight scheme. there is also a line running into the hill side to supposedly a mine. I did originally draw this scheme with a platform in it, but since making the model I decided that I wouldn’t have a platform on the layout, it makes it too congested, and the passenger trains would just run straight through the layout. So primarily it is a railway/canal interchange.

However I was not particularly happy with this design, especially as I have always wanted to model a canal lock and to allow narrowboats to wind at the end of this terminus, the width of which as can be seen takes up a lot of space. Also it seems a tad short from the terminus to the tunnel, although this can be found in real life at Froghall on the Caldon Canal at it’s terminus, but there is a lot more space available at Froghall. So I redesigned it and produced Model No.2. However as soon as I finished it I was not happy with it, as the canal lock ended up parallel and very close to the railway track, approximately where the platform is on Model No.1 above. Hence immediately on it’s heels came model No.3 below.

SAM_1570b

SAM_1571bSAM_1572b

Model No.3 of my proposed new model railway layout. As can be seen I have taken this one a stage further by painting it. The blue is obviously the canal, yes I know canal water isn't blue, but I have to distinguish it from the grassy/woodland areas. The grey is the railway track, the black is a road, the red is brick walls and tunnel entrances and of course the green is grass/woodland. I am much happier with this design, although the actual shape of the landscape may well change once I start building it.

Keith.

Model Railway

During this winter I have built a small model railway inside Hadar. I have been a model railway engineer since my early teens, culminating in building an ‘0’ gauge exhibition layout “Holmehurst” and exhibiting it around the country in the 1990’s. Since moving onto Hadar I tried to build a ‘009’ narrow gauge layout in a pine box, but due to the tightness of the curve, only one of the locos I had could negotiate it. Since we moved onto our residential mooring here in Warwick I had planned to build a ‘009’ layout in the garden. Having towards the end of last year been on-board a colleagues boat where he is building a ‘009’ layout around his saloon, this got me thinking.
SAM_1375
This was the original layout from inside the box, which in this photo I have already sawn the board up and removed the curved track.
SAM_1377
This photo is with the sections repositioned to form the new layout.
SAM_1384b
The layout has had a wood edging added to it and placed in it’s position on the shelf above the display cabinet with my ‘0’ gauge rolling stock in it.
SAM_1385b
The new section of track has been added to reconnect the original two halves.
SAM_1387b
Viewed from the end of the layout.
SAM_1390b
Electrically testing the layout with some of the existing stock having wired up the layout. The existing stock is what I kept from my late father’s layout.
SAM_1409b
Starting construction of the road bridge over the railway to divide the layout to the right, from the “fiddleyard” to the left. A “fiddleyard” is a model railway term for the rest of the railway, which is where rolling stock can be changed.
SAM_1422b
Ballasting the new section of track.
SAM_1427b
The road bridge is completed.
SAM_1432
The baseboard and landscaping has been painted with “chocolate” emulsion paint.
IMG_1387b
Ballasting completed.
IMG_1390b
Attaching the 3 buildings and fences. the smallest building came ready made and painted, the other 2 were kits which had to be built and painted.
IMG_1391b
Trees positioned and fixed in place.
IMG_1396b
Rock face and bushes fixed in place at the end of the layout, appropriately shaped so I can still see all of the TV from my armchair!
IMG_1397b
Level crossing made from balsa wood and painted.
IMG_1402b
Scatter and foliage added. Scatter is very small material that is appropriately coloured to represent, grass, meadowland, etc..
SAM_1457b
PVA glue applied to the baseboard before sprinkling the scatter on the front of the layout on what will be a sheep field.
SAM_1459b
Applying the PVA glue at the rear of the layout behind the fencing.
SAM_1462b
The rear of the rock face has been finished off with balsa wood, and subsequently varnished, to hide the rough rear to the ‘cork’ that I used for the rock face, and the wood construction to attach it to the baseboard.
IMG_8160b
Sprinkling ‘scatter’ on using a teaspoon!
IMG_8170b
Different coloured scatter used in the station and mine area, the darker grey scatter represents the tarmac roadway. The lighter grey has just been applied and awaiting drying before removing the loose scatter.
SAM_1471bSAM_1470b
Station and mine area scatter completed and the station platform constructed from balsa wood fixed in place
IMG_1413bThe high level line which emerges from the mine again constructed from balsa wood with tipper wagons on the mine track, which tip the material mined into the larger wagons below.
IMG_1417b
Level crossing barriers and loading gauge fitted. A loading gauge is to check that wagons are not loaded too high to clear bridges etc..
IMG_1425b
The high level line platform completed with safety barriers and access ladders, and the mine entrance constructed and all painted.
IMG_8229IMG_8231IMG_8234
3 stages of adding ‘spilled’ mining material on and around the high level line. Stage 1: selecting a piece with a pair of tweezers. Stage 2: applying PVA glue to the selected piece. Stage 3: positioning the piece in place.
IMG_1437
Mine workers fixed to the layout.
I then painted some wild animals and placed them in various locations around the layout.
IMG_8291b
A Badger.
IMG_8293b
A Hedgehog.
IMG_8295b
A pair of Squirrels.
IMG_8297b
A Hare running beside the track.
IMG_8298b
4 Rabbits.
IMG_8305b
Finally a Weasel scurries alongside the road.
IMG_8332IMG_8329
Rock climbers on the rock face, either side of the mine. Like the wild animals I had to paint these.
SAM_1509
A farmer with his tractor and trailer about to collect some sheep.
IMG_8372
A Landrover crossing the road bridge. I made the ‘Hump-Backed Bridge’ sign by printing out the image on our printer and sticking it to a needle painted grey.
IMG_8389b
This model of a Baldwin 2-6-0 loco I originally built for my late father for his layout. I have repaired and repainted it and got it running quite nicely now, hope Dad likes to look down on it.

And finally station station staff and passengers were added to the layout, which has completed it.
SAM_1530SAM_1526
SAM_1529

The finished layout.



Since taking the last photo I bought some new carriages and they fouled on the fencing between the track and the footpath from the road to the platform. I therefore had to remove that piece of fencing. Also I must check the height of any future level crossings, as the steamcoach I have fouls on the one I built! I am not too bothered about this as I have enough passenger coaches for this layout.
Now I can sit back and enjoy it. In the meantime, Jo has suggested that when we stop selling coal, I should build a larger layout in the hold, which I have already started making plans for. Watch this space for when I start that project.
Keith.