Today our new generator was installed in Hadar’s engine room. The steel plate was placed on the calorifier mounts to aid sliding the new generator into place.
The new generator is lifted out of its packing crate.
Lowering the new generator into the engine room through the side doors.
In position and fixed down onto the original generator mounting blocks. A big sigh of relief that it not only fits in, but there is room for all the pipes etc. to come out.
With its soundproof cocoon temporarily installed, the calorifier reinstalled and the shelf/step above it refitted.
Keith.