Pleasant day, if still chilly, but the wind picked up again making it hard work, so we stopped early again because of the wind but also we didn't want to chance getting to Welford junction, our intended destination, to find no mooring space. Now moored after bridge No.33 south of South Kilworth.
11¼ miles 7 locks 1 tunnel in 4hrs 45mins. what3words /// dream.sharpened.party 😊
1st lock at Watford locks
2nd lock
1st of the staircase locks
All the gates in the staircase were leaking a bit, gave the front of the boat a good wash though
Leaving Watford top lock
M1 bridge above Watford locks
Entering Crick tunnel
Crack's Hill beacon
A14 bridge
Now moored past bridge No.33 south of South Kilworth
Keith
No comments:
Post a Comment