Started off fine, but slight drizzle stopped play just as we were mooring up. No queue at Watford locks, and only 1 boat coming up the staircase. Now moored after bridge No.3 of the Leicester line of the Grand Union, where we were 12 days ago.
11¼ miles 7 locks 1 tunnel in 4hrs 50mins. what3words /// polished.denser.contoured
Piling work
Yelvertoft Marina, I know it is, it says so on the sign
Jo steering
Nice to see so many cowslips along the towpath
Crick Marina, I know it is, it says so on the sign
Crick tunnel
Who's nicked the front of me boat!
Approaching Watford top lock
The M1 crossing the canal above Watford locks
Temporarily moored above the locks waiting to go down
Whilst waiting I took a couple of photos from around the locks
This one too, showing the side pond between the top lock and the start of the staircase
One of the side ponds filling from the lock
Going down
A bit leaky behind me
Very leaky behind me, still washed the counter off for us
Exiting Watford bottom lock
Now moored back at Bridge No.3
Keith
No comments:
Post a Comment