What a fantastic week we have just had with the fitout of Hadar. Having chatted to Roger and worked out where we wanted the wiring to go, he set about lining out the main cabin, where the bathroom, utility room, galley and saloon will be. All of it is being fitted into an 18 foot space, so it will be very cosy. Like the boatsmans cabin and engine room the ceiling is tongue and groove timber through out.
It was only whilst seeing the wiring being fitted that you can appreciate how much there is behind those walls! Things are really moving along at a pace. We have gone for down lighters throughout, with switches for pairs of lights, so we do not have to have all the lights on at once. in the galley and saloon, thus giving us the chance to have some mood lighting if we wish.

With all the wiring done. Flooring down and ceiling timber up Roger will be starting to fit the upper walls. By the time I post the next round of photographs you will really see a difference. Keith and I have already sat down and worked out what fixture and fittings we want for the bathroom, galley and saloon. We already have our washing machine, tumble drier, fridge freezer, and cooker. We cannot wait to see them in place, it is very exciting.

No comments: