Following an excellent Easter weekend at National Waterways Museum Ellesmere Port, we have been helping clear up after the event. Yesterday we helped move trestle tables to the van to take them away, and put chairs back where the belong. This morning I helped boats down through the lock and onto the Manchester Ship Canal for their return journey. Once this was done we moved Hadar up through the 2 locks and have moored in the top basin for tonight, ready to head for Chester tomorrow.
Both our internet connections keep disconnecting, despite a good signal strength, so I will wait for a better signal before uploading some of the many photos I took over the weekend.
Keith.
No comments:
Post a Comment