At Canal Central, there is a 12” gauge railway being built, which should be a nice feature for the canalside shop/information centre/Post Office/B&B/camp-caravan site. This is the eco-friendly Canal Central building.
This is the engine/rolling stock shed.
This is the engine and rolling stock housed in the shed.
The track leaving the shed.
Part of the loop which circles around the camping/caravan site.
Work being carried out on laying the track ballast.
Keith.
No comments:
Post a Comment