Sunday, March 25, 2007
Week Twenty One
Friday, March 16, 2007
Week Twenty... Hadar is Craned Out to go into the Paintshed
The Final Push.
Tuesday, March 13, 2007
Week Twenty
The final coat of paint was applied to the engine room, the green is to match the engine and the background of the roses in the boatmans cabin. Keith spent sometime with Tina the boat painter to choose the colours for our Grand Union Canal Carrying Boat, we are going with the Red, White and Blue colour scheme, and have choosen from International Paints obviously White, the Blue is Bondi Blue and the Red is Rochelle Red. It will look fabulous.
Diesel Generator ready to be Installed.
The diesel generator was installed in the engine room today. It took quite a while to prepare the night before, removing all the soundproof casing, as it would not fit in the engine room with the casing on. It took quite a lot of effort and careful maneuvering to ease it in through the engine room doorway. Once inside the engine room it then had to be maneuvered around the engine to the other side of the boat, and the corner where it will reside.
The Generator goes Slowly in through the Engine Room Doorway.
The generator is to supply the power requirement for the washing machine and/or the tumble dryer, which is higher than that which the invertor will supply. But the major reason is that it will be used to charge batteries when moored in a location for a few days, rather than running the vintage National engine, I would rather wear out an easily replacable generator than a very rare vintage engine.
Installed in the Corner of the Engine Room.
Sunday, March 11, 2007
Week Nineteen.
Water Tank in Postion in the Bow.
We put Misty Lady up for sale with Longport Brokerage and no sooner was Misty Lady on the market, than we sold her, it only took one week. It is one less worry for when Hadar is completed knowing that we have a new owner for Misty Lady . Once Hadar is finished and we have moved on to her, the new owner can take over Misty Lady. It will be sad to see her go as she has been our home for 2 yrs and our first boat. But we will be fulfiling a dream with Hadar and that is extra special.
Misty Lady Sold
Friday, March 02, 2007
Week Eighteen
Port Granite Worktop and Tiling.
Starboard Granite Worktop and Tiling.
The galley now has a country kitchen feel to it, and that is exactly what I wanted. Yes that is me in the back ground. Keith and I are so pleased with the way things have progressed so far. Roger has worked really hard on Hadar and we look forward to another exciting week ahead.
Monday, February 26, 2007
Week Seventeen
Tina has now completed the Roses in the Boatmans Cabin. She still has some of the small Castles to do, but she will do these once Hadar is in the paintshed.
Roger has now lined and framed the galley side doors. This now completes the major carpentry in the fore cabin. The galley side doors are for ventilation and light only, there is no physical access through them as they are above the galley worktops.
Tina has undercoated the engine room, and this is now ready for the gloss coats to go on, the upper walls will be cream and the lower walls green to match the engine colour. Tina is off next week, but upon her return the following week they hope to put Hadar in the paintshed, providing everything is completed that Roger wants done before she goes in there. It could be a busy week for him next week!
Toilet Floor Tiles.
Saturday, February 17, 2007
Week Sixteen

Tina started painting the Castles in the Boatmans Cabin. She did 3 to begin with, the one on the table and the 2 on the cupboard doors over the bed'ole. I was very priviledged to be allowed to sit in at each stage to take photographs, always trying to make sure I did not get in Tina's way.


Castles.

Roger in the meantime has also been very busy with the rest of Hadar's fit out. He made and fitted the door panels for the doors into the hold. He has also been adding the edging strips around the timber work.
Roger then set about varnishing all the woodwork in the saloon and making the stable doors which are going between the engine room and galley. We chose stable doors so that we can have the bottom doors closed to keep Paddy (collie) shut in, but have the top doors open for ventilation when on the move. This past week has been wonderful and very interesting especially for me as I was given the opportunity to sit in and watch Tina paint. I did make sure I thanked her for allowing me this priviledge because I am well aware that not all boat painters would do this. So please always ask first.
Once all the paintwork is complete in the boatmans cabin I will make up an album of each stage, so you can sit and browse at your leisure LOL. So another week of excitement has drawn to a close ready for another to begin, and you can follow each step with us by coming back again next week to see the next installment.
Friday, February 09, 2007
Week Fifteen
The last 2 cupboards have now been fitted in the saloon. This now completes all the major carpentry.
Tina has nearly completed the graining of the scumbling in the boatman's cabin. Once all the graining has been completed it will all need a couple of coats of varnish.
Keith has been resting as he put his back out on Tuesday, Ouch!! Still it is getting better.
Tuesday, January 30, 2007
Week Fourteen
Work then commenced on the bookcase which goes opposite the display cabinet on the portside. It has been built and has been varnished before fitting inside the boat.
Work also commenced on the final bulkhead between the coal stove and the last galley base cupboard.

The stove plinth, bookcase and the final bulkhead have now been installed.
Tina has been progressing with the painting in the boatmans cabin having done the primer and yellow undercoat, she started on the scumbling. I was even given the chance to have a go. So when your looking at the scumbling I dare you to spot the piece that I did LOL. I am amazed how Tina does the scumbling and how she copes in such a confined space with the paint fumes. It is very exciting to be able to watch an artist at work.
We now have to decide what granite we want for the galley work tops, such decisions and so much to choose from. Watch this space to see what we decided on.
Tuesday, January 16, 2007
Weeks Twelve and Thirteen
Week Twelve started well, with the fridge-freezer being installed and the start of the cupboard above it.
The major news is the start of the painting. At the end of last week, Tina started filling the woodwork in the boatmans cabin ready for painting, which she started yesterday with the primer coat. The cabin doors have been done with aluminium primer, as will all external woodwork which will be exposed to the elements. The mast, stand and top-planks were similarly primed, as was the slide hatch.
The overhead cupboards will give us extra storage space for the galley and for all the computer bits & pieces. We have chosen to have overhead cupboards to increase our storage space to the maximum to conpensate for the compactness of the living area. Many people would find this too claustrapophobic but I think it helps that both Keith and I are not tall! But from Keith's experience of having lived for 6 months in the boatmans cabin on Pisces he got used to it and we have tried to carry through the same efficient use of every little space for storage in the boatmans cabin into the living area.
Roger is now tackling the display cabinet to go next the TV/computer cabinet which will house Keith's model trains from his Exhibition Layout Holmehurst.
Tina has been busy painting in the boatmans cabin with the undercoat having gone on and the start of the scumble base yellow. Scumble for those who do not know is a painting process used in narrowboats which, by painting, simulates grained wood. The base coat is a very bright yellow, followed by the scumble, a brown colour, which is applied using a scumble comb, which gives the effect of wood grain, then the whole lot is varnished to protect it. The effect it quite good in appearance but gives a very much stronger, colourful surface.
Start of the Scumble Base Coat of very Bright Yellow.
Saturday, January 13, 2007
Week Eleven.


We have had a very good week, and things have moved on apace. Roger has been extremely busy on our boat this week. The shower/toilet cubicle is now completed, awaiting tiling and the sink to be fitted.
The Inverter/charger has arrived along with the generator. This now completes all of the large purchases apart from the stove for the boatmans cabin.
Utility AreaTina Paramore the boat painter also began the paint work in the boatman cabin. Her first job was to paint knotting compound on all the knots, she then filled over where all the screw heads were showing. Her final job for this week was to sand it all down ready for priming. Having spoken to Tina I am amazed how much work and paint has to go on before we get to the Roses and Castles. You can follow the progress here in Hadar's Dairy.
Saturday, December 09, 2006
Week Ten
The wood panels are ash, with cherry bordering. We have seen the effect on a previous boat Roger built whilst we were moored here, and we rather liked it. The ash will be painted with a thin layer of ivory coloured paint and the grain shows through which we liked.
Mind you there isn't a lot of room to spare, they all just fit in with millimeters to spare. It is all going to be very snug. We are both so excited it is all our Christmases coming at once.




