Week Twelve started well, with the fridge-freezer being installed and the start of the cupboard above it.
The major news is the start of the painting. At the end of last week, Tina started filling the woodwork in the boatmans cabin ready for painting, which she started yesterday with the primer coat. The cabin doors have been done with aluminium primer, as will all external woodwork which will be exposed to the elements. The mast, stand and top-planks were similarly primed, as was the slide hatch.
The overhead cupboards will give us extra storage space for the galley and for all the computer bits & pieces. We have chosen to have overhead cupboards to increase our storage space to the maximum to conpensate for the compactness of the living area. Many people would find this too claustrapophobic but I think it helps that both Keith and I are not tall! But from Keith's experience of having lived for 6 months in the boatmans cabin on Pisces he got used to it and we have tried to carry through the same efficient use of every little space for storage in the boatmans cabin into the living area.
Roger is now tackling the display cabinet to go next the TV/computer cabinet which will house Keith's model trains from his Exhibition Layout Holmehurst.
Tina has been busy painting in the boatmans cabin with the undercoat having gone on and the start of the scumble base yellow. Scumble for those who do not know is a painting process used in narrowboats which, by painting, simulates grained wood. The base coat is a very bright yellow, followed by the scumble, a brown colour, which is applied using a scumble comb, which gives the effect of wood grain, then the whole lot is varnished to protect it. The effect it quite good in appearance but gives a very much stronger, colourful surface.
Start of the Scumble Base Coat of very Bright Yellow.





Roger then went onto make the wooden hatch slide, which was then covered in aluminium, and an aluminium strip screwed around the edge.


Then the walls were lined out with plywood and edging strips for that final detail. The whole thing looks fabulous.





The beginings of the ticket draw have begun with the frame work.




Then the lining out of the other wall began with hardboard, to this the bed and cupboard will be fitted, and there are of course wires dangling ready for connecting up when the time comes.
It has actually got exciting seeing her boatmans cabin begin to come to life.
The Hardwood Step went in and it really is a solid piece of wood. I have no idea what sort of hardwood it is, but it looks the part anyway and will definately see alot of footprints on it over the years to come.
See what I mean, it is a substantial piece of wood.
The beginings of the boatmans cabin cupboard shell have gone in. So a very busy week with the fit out. Both Keith and I really enjoy taking in all that is going on, we will definately know where every wire and screw is by the end of this journey.



The answer was to build 2 ramps up out of wood and steel plate to shift these rollers back behind the pivot point, this took quite a while as Roger wanted to be certain that she would roll down them without breaking the ramps, or falling off them! But once he was satified with the setup, the boats moored in the basin were all tied together and then drifted out of the basin across the canal out of harms way. A large piece of wood about the size of a railway sleeper was tied against the opposite bank where it was expected for her to strike the wall. Roger then gave me the go ahead to name her, which I did, " I name this boat HADARm godbless her and all who sail in her" accompanied by the mandatory bottle of champagne.


We just could not finish the day without a photograph of us with Roger Fuller and our new boat "HADAR".