Friday, August 24, 2007
Good News and Bad News.
Upon opening up the engine casing we soon discovered a further problem, emulsified oil. Then having taken the governor casing off and stripped it down it would seem that water had got to the spindle and jammed it. The route cause of this, a suspected head gasket leak, which would also tie into the water and oil we had noticed bubbling from around the head when we went for diesel. The spindle was cleaned up and refitted, moving quite freely now, and the governor assembly was refitted to the engine. Then we had to drain all the oil out and fill it up with new, before running the engine again. No leaks from the water pump and the governor was once again working properly.
The bad news is that we have to have a new head gasket made, they are not available off the shelf, and it will take 4-6 weeks to get one made. So we will be spending a few more weeks here in Stone. Keith has asked for 2 gaskets to be made so that we have a spare for the future.
Tina has been busy working out the lettering for our sheeting, have drawn it all out a couple of times and put it onto sheets of grease proof paper, she then laid it out on the sheeting to make sure it was the correct size lettering and the curve on the letting was correct. Having got an agreement from us and Roger that it looks right, she can now make cardboard templates ready for a good day to do the lettering, we need a dry calm day for this job.
The timber has arrived for the flooring in the hold, so that is a job Roger will be getting on with, as well as finishing off the final touches to the boat, which we wrote down for him. The funny thing has been that no sooner he has crossed a couple of things off the to do list we add a couple more things. Still the list is now down to 4 things and then that is that she is done yayyyyyyyyy.
We now look forward to a lovely Bank Holiday weekend, so no matter where you are, or what you are doing have a lovely time.
Saturday, August 18, 2007
New friends and wonderful comments
Roger is now back from his holiday on his boat's Azalea and butty Ilford, you may have spotted them if you were on the Llangollen. They were spotted by Sarah on NB Arcadia, who is hoping to be in Stone in the next week or two, and we are looking forward to saying hello to a fellow blogger.
Hadar has been receiving some wonderful comments whilst she has been out on the towpath. With people stopping to ask about her and her engine. I would like to to say "Hello" to those on NB Hannah, who came past us and said they had been following "Hadar" on this diary. Maybe next time we will get to have a proper natter.
Hello to the folks from working boat Denebola, which is also a Grand Union boat. They were walking along the towpath and had a nice chat with Keith.
We have been asked if "Hadar" is an original working boat been done up, and as you all know she is brand new, but in a way she is an original. She is a Roger Fuller original, and there will never be another one like her, even if Roger does build another Small Northwich for another customer. Because all of Rogers boats are Bespoke you will never ever see two the same.
Well it is the weekend and we hope that where ever you are, you are having a wonderful time. Hopefully next week things will progress on "Hadar" and I can add some photos to let you see the work being carried out. Take care and stay safe.
Wednesday, August 08, 2007
A peaceful weekend and a busy week
Heading into the weekend and who should we see coming towards the basin above Lime Kiln Lock, but Andy and his dog Simba on Khayamanzi. He was a welcome sight as we had not seen him for almost a year, whilst on our travels. Andy was well and heading for the Anderton lift and the river Weaver. So after a quick natter with him on the move we said our goodbyes and hoped to see him again soon. Andy had a wonderful floral display on his roof top, an absolute credit to him.
With the weekend uopn us we took "Hadar" out of the basin and onto out boat painters mooring whilst they took their boat out for the weekend, it gave us the opportunity to clear out the hold of all the stored goodies we had in their. We had decided if there was no room for it in a cupboard, draw or under the floor, then it was going either in the skip or in the boat sale boxes. It was actually amazing because we managed to store a lot of the stuff on the boat. Although I did fill two boxes with things to sell.
Paddy has well and truly made himself at home on the boat, and likes to curl up by the saloon stive with his head on the harth. Whilst taking this photograph Paddy was having doggy dreams, his paws were twitching and he was making gruff noises, he looks so sweet and peaceful.
Today (Wednesday) and we had a lovely visit from some blogging friends on their narrowboat Balmaha. Their blog is well worth a read, it can be very entertaining. Mo and Vanessa came to see "Hadar", and of course us lol, it was actually wonderful to put names to faces, and you know I felt like I had known them for many years, and yet today was the first time we had met in person. They spent must have been a good 3 hours with us, how the time flew as we nattered about all things boaty. It was wonderful to finally meet them and to find out how things were for them on the cut.
Keith and I then walked on round to Mo and Vanessa's boat, and a beautiful boat it is too. The photographs do not do their boat justice. It is a credit to them and the builder who built for them. They are now on their way, and will be making their way possibly onto the Caldon so if you see them give them a cheerie wave and say hello. Mo and Vanessa we hope to see you on the return trip... So as you can see although nothing much is happening on "Hadar" we have been kept busy.Friday, August 03, 2007
First Trip.
Awaiting the 800litres of Diesel.Yesterday following the fitting of the fenders we took Hadar down to Stone Boat Building to fill up with diesel. This was her 2nd trip out, but the 1st doesn't count as we only winded her so we could fit the stern fenders. It takes quite a while to load in 800litres of diesel, and a lot of money!
The Builder Tries Her Out.Fender Fitting
Monday, July 23, 2007
Decorateded Boatmans Cabin.

Today Roger is making the removable perspex windows to fit in the galley doors.
The photos below are just more views of the decorated boatman's cabin.

Thursday, July 19, 2007
We Have Moved Onboard
Polishing & Stringing
As many of you must be aware the weather has not been great, but when the weather held out for long enough I polished all the brass, then helped me Keith fit all the new white strings to the sheeting. Tina was able to touchup some of the paintwork, and gave the boatman's cabin it's final coat of varnish. True to form of late the heavens opened, so rain stopped play.
Thursday, July 05, 2007
Hadar's Relaunch
At this stage the bow is rolling on rollers inside the shed. It all has to be taken very slowly stopping and checking at regular intervals to make sure everything is going alright.
Week Thirty-Six

The Finished Engine Room Doors.
Today is now all about waiting. Hadar's paintwork is completed and she is ready to come out of the paintshed. We are just waiting for the weather to settle down. It could be today, but more than likely tomorrow. We will just have to wait and see.
Flywheel Cover.
The Covers in the engine room have been painted and fitted. The red one is to cover the flywheel, and the green one covers the alternators. These should protect both crew and especially Paddy from injury.

Alternator Cover.
The cover over the calorifer has also been fitted. All these covers are easily removable for access and maintenance work.

Calorifier Cover.
Saturday, June 30, 2007
Week Thirty-Five
Work has progressed well inside and outside on Hadar. Roger has finished the area where the range goes in the boatman's cabin. The base is aluminium and the walls are plasterboard. He has also completed fitting the red moulding to the boatman's cabin woodwork. Even young Steve has been working on her, doing various bits and pieces, such as making the fitting for the headlamp to go on the top of the post, the bracket for attaching the klaxon to the slide hatch, and the flywheel and alternator guards for the engine, which are essential to ensure Paddy's tail doesn't get caught in them whilst the engine is running.
The boxing in of the calorifier has now been fitted which will also accept one of the fixings for the alternator guard. Tina has now completed all the signwriting, and it looks really great.
With all hands to the pumps, things have been moving along briskly. Many of the smaller fitting and fixtures are being painted, such as the flywheel and alternator covers.
All 4 navigation lights have been fitted and the 4 fold down brass steps on the cabin sides. Although not quite traditional I feel that if working boats had carried on in large numbers that boatman would have opted for such luxuries in later life.
The stern navigation light will also act as a deck light as it is independantly switched in the boatman's cabin. This will also mean that it can be used in tunnels without having to have all 4 navigation lights on.
Calorifier Box and 1 of the Porthole Rings.
Preparing the Hull for Blacking.Who let me (Jo) loose with a power tool? We volunteered to black the hull of Hadar as it would be good experience for when we have to do it in the future. I removed the rust, with the sander, that had accumulated whilst she was in the water for 10 months. Whilst I was doing this Keith was masking off the gloss paint areas which meet the blacked area.
Fitted Boatman's Cabin Flooring.Roger fitted the vinyl flooring to the boatman's cabin floor. We found 2 pieces of this in the corner of the local carpet shop, and got them both for £15. It finishes off the cabin so well, we are both delighted with the look.
Blacking the Hull.No Keith did not black the whole of the hull with a 1" wide brush! He was filling in the bits that the roller had missed. We rollered the blacking on having seen both this method and brushing it on, and the roller method is definitely easier and quicker.
Final Roses.As we were blacking the hull this meant that Tina could get on with finishing painting other parts of the boat so that she is ready to come out of the paintshed next week. This included the final set of roses on the boatman's cabin doors, and hopefully the final coat of blue on the inside of the engine room doors.
Completed Blacking from the Bow.We finished the blacking late in the afternoon. We both were very tired, a 70ft boat takes a lot of blacking. We both slept well that night.
Completed Blacking from the Stern.Sunday, June 24, 2007
Week Thirty-Four.
Bow Name Prepared for Shading.
Port Side Shading Partly Completed.
The start of the shading to all the signwriting at the stern began.
Starboard Bow Name has Received it's Shading.
The start of the shading to all the signwriting has begun with the bow name.
The Masking Tape is Removed.
Engine Room Doors Blue.The engine room doors received a coat of blue on the inside. The final coat will be the last of the major cabinside paintwork, leaving just the signwriting to be completed. Talking about signwriting this is progressed really well.
Starboard Side Shading at the Stern started.
Starboard Side Shading Partly Completed. The shading of the signwriting was completed on the starboard side.
Completed Shading of Signwriting on Starboard Side.The port side is progressing. Note how Tina starts from the right and signwrites to the left, this is because like Keith she is left-handed.
Port Side Shading.
Battery Boxes Fitted.More of the red moulding can be seen below, along with the raised floor in the engine room which covers the propshaft. This would normally be level with the boatman's cabin floor, but because the flywheel is so large and the engine thus sits very high, it has had to be raised to clear the propshaft.
Engine Room Floor.





Fitting the 2nd Tipcat.
























