Work recommenced on Hadar this week after the Christmas and New Year break.
We hope you had a wonderful time and enjoy reading Hadar's progress to completion during the beginning of 2007.

The installation of the automatic bilge pump under the forecabin floor.

Bilge Pump In Place

With many water appliances installed in a boat these days a bilge pump is a neccessity should any of them fail and discharge water into the bilges in the galley/shower/laundry area. Also the main water pump and the shower tray pumpout pump were installed along with all the associated pipework for supply of hot and cold water and disposal of waste water.

All the plumbing for the Galley and Bathroom

The stove for the saloon arrived and it is lovely.


Aarrow Acorn Multi Fuel Stove

The pipework was completed and the platform for the toilet to stand on was built. Roger then worked on the remaining wall and the door into the shower/toilet area.

Shower and Toilet Area

We have had a very good week, and things have moved on apace. Roger has been extremely busy on our boat this week. The shower/toilet cubicle is now completed, awaiting tiling and the sink to be fitted.
The washing machine and tumble drier have now been installed on the opposite side to the shower/toilet. The fridge-freezer was installed in its final position, next to the washing machine and drier. The cupboard above the drier is completed apart from the doors.
The Inverter/charger has arrived along with the generator. This now completes all of the large purchases apart from the stove for the boatmans cabin.


Utility Area

Tina Paramore the boat painter also began the paint work in the boatman cabin. Her first job was to paint knotting compound on all the knots, she then filled over where all the screw heads were showing. Her final job for this week was to sand it all down ready for priming. Having spoken to Tina I am amazed how much work and paint has to go on before we get to the Roses and Castles. You can follow the progress here in Hadar's Dairy.