Lived on-board Hadar

Daisypath Vacation tickers

Monday, November 21, 2011

A Very Short Journey

Map picture

 

This morning I removed the oil filter assembly from Hadar’s engine, to service the oil pressure relief valve, which I was suspecting was jamming, and allowing an initial oil pressure up to 100psi, instead of it’s usual 70psi. I removed the relief valve from the housing and cleaned it up and replaced it. After lunch we moved Hadar to the other side of Turn’s Bridge No.52, to the 48hr moorings, ready for our Tesco delivery tomorrow. We must have travelled all of 200 metres between the 2 moorings!

Keith.

No comments: