5.5 miles, 1 lock, 1hr 55mins.
With the overnight rain and warmer temperatures the ice and nearly all the snow had disappeared so we were ready to set off after breakfast. However due to the rain and the thaw the River Avon was in flood.
This is the entrance to Welford Marina.
The River Avon road bridge.
The river has flooded the road near the bridge.
The overspill above Welford lock.
These 5 of 11 wind turbines have appeared alongside the canal since we came through here last October.
Keith.
No comments:
Post a Comment